OCTOBER / 2020

BULDINGS WITHIN PLOTS

PLOT 2

• Demolitions, Excavations, Containment and Foundations completed
• Drainage and Ground Slab concluded
• Vertical Elements and 1st Level Slab – Completed
• Vertical Elements and Intermediate and 2nd Level Slab – Completed
• Vertical Elements and Housing Parking Slab – Completed
• Vertical Elements and ground floor housing slab – Completed
• Vertical elements and 1st floor slab – In execution
• The Excavations and Containment of the 3 north ramps to Av. Marechal Carmona have been completed
• Vertical Elements and Slabs in Elevation of the 3 ramps in execution

PLOT 4 (up to Silo)

• Demolitions, Excavations and Containment completed
• Foundations completed
• Burried structures of the new supermarket technical area – concluded
• Vertical elements and 1st level slab – concluded
• Vertical elements and roof slab of the New Supermarket under construction

COMMERCIAL PROJECT – PLOTS 2 AND 4

• Finishes and Special Installations for Parking at Level 9.50 have started

CURRENT SUPERMARKET IN EXPLORATION

Completed the 1st Stage of the Adaptation Work for actual supermarket – Conveyor Foundations

 GENERAL INFRASTRUCTURES

With the monitoring, inspection, and follow-up of public service concessionaires – EDP, PT, ÁGUAS DE CASCAIS, CÂMARA MUNICIPAL DE CASCAIS, GALP ENERGIA

AV. MARECHAL CARMONA
• North tunnel under development
• Excavations and South Tunnel containment under development
• Intermediate tunnel work have started
• Remaining buried infrastructures ongoing

AV. MARGINAL
• Pluvial Sewer Connection to Ribeira da Castelhana concluded